Orange County Site Power ยท Irvine, CA
Temporary Power Pole Rental
A permitted pole with a breaker panel and GFCI outlets, set and inspected so Edison can energize your lot. Call (949) 832-7229 for a free estimate.

Construction Power Poles Set Across Orange County
A temporary power pole is the simplest way to put utility power on a lot that has no working service. We set a treated wood post or a steel stand, mount a weatherproof panel with a meter base, breakers and GFCI receptacles, and bring the connection to the point Southern California Edison designates. Once the city inspects the installation and Edison sets the meter, your crews plug saws, compressors, battery chargers and the job trailer into metered power instead of feeding a generator every morning.
In Orange County, most of our poles go up on custom home rebuilds and tear-downs in the older tracts of Huntington Beach, Costa Mesa and Fountain Valley, on additions and ADUs in Tustin and Lake Forest, and on lots inside Irvine villages where the original house is coming down to the slab. We also set poles for model complexes, utility trenching jobs and small commercial pads where the permanent switchgear is still months away.
If the lot sits far from an Edison connection, or the meter date slips, Mobile Generator Rental can carry the work in the meantime. Many builders also hang Jobsite Lighting from the same pole once the site is energized, which keeps the setup compact and easy for the inspector to read.
Paperwork and Placement Sorted Before the Truck Arrives
Most delays on a temporary pole come from the sequence of approvals: a permit from the building division, a site plan that shows the pole location and clearances, an inspection, then a release to Edison and a wait for the meter. We walk the lot with you or your superintendent, mark a spot that clears the driveway, the dumpster pad and any future trench, and pull together the details the city asks for. That keeps the pole from becoming the reason framing starts a week late.
Inside master-planned communities, placement carries extra weight. Plenty of HOAs want equipment set back from the sidewalk and kept out of common-area sightlines, and a few ask for a screen on the fence. We plan for that from the first site walk. On coastal lots we choose enclosures and fasteners suited to salt air and look them over on every visit, because rust on a panel near the beach shows up sooner than most crews expect. Builders who start with a pole often keep the same Orange County temp power crew for lighting, cameras and cooling as the project grows.
Jobs Where a Temp Pole Earns Its Keep
A pole fits any project that will run longer than a few weeks and sits within reach of the grid. These are the jobs where we set them most often in Orange County.
Coastal Rebuilds Down to the Slab
When a Huntington Beach or Costa Mesa house is demolished, the old service drop is removed with it. A pole gives framers, plumbers and finish trades metered power for the months between demolition and the day the new panel goes live.
Room Additions and Backyard ADUs
An addition or accessory dwelling unit can pull heavy loads from saws, heaters and compressors that an older home panel was never sized for. A separate pole keeps that load off the house and away from the family still living in it.
Lots Inside Gated Villages
Rebuilds in Irvine villages and Tustin Ranch often face strict delivery hours and placement rules. One permitted pole replaces the engine noise and fuel deliveries of a generator, which the HOA and the neighbors tend to appreciate over a long build.
Small Commercial Pads and Shells
Pad buildings, restaurant shells and retail remodels often need power long before the permanent switchgear is energized. A pole sized to the actual tool load gets the trades started on schedule while the electrical engineer finishes the permanent design.
From Site Walk to Energized Pole
Site Walk and Load Check
We look at the lot, the Edison connection point and the tools your crews plan to run, then size the panel and breakers to match. If you have a site plan or a grading plan, we mark the pole location right on it.
Permit and Pole Location Drawing
We prepare the details the building division needs, including the pole location and clearances, and agree with you on who pulls the electrical permit. Parcels outside city limits are handled by the county instead.
Delivery and Setup on Your Schedule
Our crew sets the post, mounts the panel, drives ground rods and labels every circuit. Delivery times follow your community's rules, and we leave the area around the pole clean and clear of packaging.
Inspection and Release to Edison
After the city inspector signs off, the release goes to Edison, and the utility schedules the meter set and turns on the service. We track that step and keep you posted on any change in timing.
Relocation, Service Calls and Removal
If the pole has to move for grading or a driveway pour, we handle the move. When the permanent service is live, we pull the pole, fill the hole and haul everything away.
Pole Hardware, Grounding and Salt Air
Panel Sizes and Outlet Counts
Most residential poles carry a 100 or 200 amp panel with several 20 amp GFCI receptacles and a 240 volt outlet for a welder or a larger compressor. Commercial poles can be sized up. We match the panel to the tool list you give us and leave room for the trades who arrive later in the job.
Grounding and Pole Clearances
Each pole is grounded with driven rods and bonded to code, and the inspector checks that work. We also keep clearance from structures, driveways and planned trenches so the pole does not have to move halfway through framing.
Corrosion Checks Near the Beach
Within a few miles of the ocean, morning fog leaves a salt film on everything it touches. We use corrosion-resistant enclosures, check terminals and breakers on service visits, and swap parts that show rust before they cause a nuisance trip or an inspection problem.
Temporary Power Pole Rental Questions From OC Crews
Who pulls the permit for a temporary pole in Orange County?
It depends on the city and the project. On many jobs the general contractor pulls the electrical permit, and on others we take care of it. We settle that during the first call and supply whatever drawings or details the building division needs.
How long does Edison take to energize a temporary pole?
Timing varies with the season, the area and the utility's workload, so we do not promise a fixed number of days. The clock starts after the inspection passes, which is why we request the inspection as soon as the pole is set.
Can the pole stay in place for the whole build?
Yes. Most poles stay until the permanent panel is energized. Rentals run month to month, and we only move a pole when grading, a concrete pour or a change in the site plan calls for it.
Is a temporary pole quieter than running a generator?
Far quieter. A pole has no engine and needs no refueling, which is a big reason HOAs and neighbors in residential tracts prefer one on longer projects.
What if my lot is in unincorporated Orange County?
Unincorporated areas such as North Tustin go through OC Public Works instead of a city building division. The steps look much the same, and we plan for the county process when we set the schedule.
Often Booked Alongside
-
Construction Internet
Cellular or satellite internet for job trailers, sales offices and camera systems before the building has a line.
-
Security Camera Towers
Solar camera towers with remote viewing that watch materials, equipment and fencing after crews go home.
-
Mobile Generator Rental
Enclosed and towable generators sized to your load, delivered with cables, distribution and a fuel plan.
-
Jobsite Lighting
LED floods and towing light towers for pre-dawn starts, evening pours, event parking and dark yards at night.
-
Portable Air Conditioning
Spot coolers and ducted portable AC for buildings under construction, event tents and server rooms in a pinch.
Send us the job address, your start date and the list of what needs power. A coordinator will build the setup around your schedule and your community rules.